Image
WESTCHESTER COUNTY: An engineer is working to temporarily open the bridge for traffic in one direction.
Workers have close the section of the parkway overnight for emergency repairs.
The stones being removed will be set aside so they can be safely put back once the bridge structure is complete.
The bridge could remain closed for at least a month.
Patchy rain nearby, with a high of 47 and low of 35 degrees. Overcast during the morning, cloudy for the afternoon, clear in the evening,